| 1. | Programmable controllers - part 2 : equipment requirements 可编程控制器.第2部分:设备要求 |
| 2. | Programmable controllers - equipment requirements and tests 可编程控制器.设备要求和试验 |
| 3. | Programmable controllers - part 2 : equipment requirements and tests 程序控制器.第2部分:设备要求和试验 |
| 4. | A structural demonstration method on equipment requirements based on qfd 的结构化装备作战需求论证方法 |
| 5. | Programmable controllers - part 2 : equipment requirements and tests 程序控制器.第2部分:设备要求和试验 |
| 6. | Air traffic control equipment requirement of civil aviation airport tower 民用航空机场塔台空中交通管制设备配置 |
| 7. | Ground equipment requirements for compatibility with aircraft unit load devices 地面设备与飞机单元装载设备的相容性要求 |
| 8. | Programmable controllers - part 2 : equipment requirements and tests ; corrigendum 1 可编程控制器.第2部分:设备要求和试验.技术勘误1 |
| 9. | First the process model of equipment requirements development is established based on cmmi 提出了一种轻量级的装备需求开发过程改进方法。 |
| 10. | Programmable controllers - part 2 : equipment requirements and tests iec 61131 - 2 : 2003 ; german version en 61131 - 2 : 2003 可编程控制器.第2部分:设备要求和试验 |